Skip to content
Ruislip News

Ruislip Flood Schemes: Work Under Way at Park Wood, Pinn Meadows and Bessingby Park

Ruislip flood schemes are under way at Park Wood, Pinn Meadows and Bessingby Park to slow water into the River Pinn. What is being built and when.

Ruislip flood schemes: a small stream running through woodland

Ruislip flood schemes at three sites are under way, with Hillingdon Council building leaky dams, ponds and bigger rainwater pools to slow water flowing into the River Pinn.

The council said construction started in October on projects at Park Wood, Pinn Meadows and Bessingby Park, designed to cut the risk of homes and roads flooding during heavy rain.

The three Ruislip flood schemes

SiteWhat is being builtDue to finishFunding
Park WoodFive leaky dams, a new pond and other woodland worksOctober 2026Thames Regional Flood and Coastal Committee and HS2 Community and Environment Fund
Pinn MeadowsRestoring Elma’s Ditch, a bigger groundwater pond and changes to pipesDecember 2026Defra Natural Flood Management Fund
Bessingby ParkDeeper, wider rainwater pools and a soil mound on the southern edgeNovember 2026Council Carbon Offset Fund

How the Ruislip flood schemes work

Park Wood is a Site of Special Scientific Interest. The leaky dams there hold water back for a short time after heavy rain, so less of it rushes into the River Pinn at once. The council says this should reduce flood risk on roads downstream, including Park Avenue and Broadwood Avenue.

At Pinn Meadows, Elma’s Ditch is being returned to a more natural course and the pond enlarged so it can store more water. At Bessingby Park, the pools that collect rainwater and drain it slowly are being made bigger, and the soil dug out will form a protective bank.

What the council said

Cllr Adam Bennett, Cabinet Member for Community, Environment and Enforcement, said the projects will help future-proof the borough against climate change, protect residents and businesses from extreme weather, and create new wildlife habitats.

What it means for walkers

Parts of Park Wood, Pinn Meadows and Bessingby Park may be fenced off while the Ruislip flood schemes are built. Follow signs on site and keep dogs on leads near work areas.

More details are on the council’s flood resilience pages at hillingdon.gov.uk/flood-resilience-projects.

Related reads

For more local news and guides, visit Hillingdon News.

Scroll to Top